Abu Zayan Reservoir - LIBYA
PROJECT ABU ZAYAN RESERVOIR (WITHIN THE CONTENT OF CONSTRUCTION OF WORKS OF WATER SUPPLY LINES OF TARHUNA ABU ZAYAN AND TRIPOLI BIFURCATION BIR EL GHANAM) CLIENT GMMR – JABEL HASAWNA – Jefara Water System Utilization Authority CONSULTANT BRNA CONTRACT DATE 18.08.2002 GENERAL DESCRIPTION OF THE PROJECT Construction of a concrete reservoir with a capacity of 300,000 m3 construction of a valve chamber installation of Ductile Iron pipes with diameters varying between 400 mm & 1800 mm with a total length of 7068 m operation and control buildings. MANAGEMENT ROLE OF NACO FOUNDER General Manager of Contracting Company
|