Abu Zayan Reservoir - LIBYA

PROJECT
ABU ZAYAN RESERVOIR (WITHIN THE CONTENT OF CONSTRUCTION OF WORKS OF WATER SUPPLY LINES OF TARHUNA ABU ZAYAN AND TRIPOLI BIFURCATION BIR EL GHANAM)

 

CLIENT
GMMR – JABEL HASAWNA – Jefara  Water System Utilization Authority 

 

CONSULTANT
BRNA

 

CONTRACT DATE
18.08.2002

 

GENERAL DESCRIPTION OF THE PROJECT

Construction of a concrete reservoir with a capacity of 300,000 m3 construction of a valve chamber installation of Ductile Iron pipes with diameters varying between 400 mm & 1800 mm with a total length of 7068 m operation and control buildings.

 

MANAGEMENT ROLE OF NACO FOUNDER

General Manager of Contracting Company

 

 

   