PROJECT
Contract No. (2003/5) for Supply and Installation of 400 kV Overhead Line of Sirte-Tripoli
CLIENT
GECOL (General Electric Company of Libya)
CONSULTANT
ACESCO-EL EMAAD
CONTRACT DATE
15.07.2003
GENERAL DESCRIPTION OF THE PROJECT
500 km+75 km (%15) km 400 kV, SC OH ENERGY TRANSMISSION LINE FROM between TRIPOLI-SIRTE
DETAILED DESCRIPTION OF THE PROJECT
Energy Transmission between Tripoli-Sirte via an OHTL 400 kV Single Circuit triple conductors.
Main Activities:
Engineering and design of type of towers and tower foundations,
Supply of line materials,
Supply of Tower materials,
Training of the Employer staff
Survey and tower spotting,
Access road and excavation,
Concrete foundation of different type including rebar, and stub of the tower
Backfilling and earthing of towers,
Tower erection,
Stringing of Earth wire/OPGW,
Stringing of Conductor,
Sagging and clipping of the conductor and earth wires/OPGW
Main Quantities:
Foundation of 1,350 no’s of tower
Erection of 1,350 no’s of tower
Stringing of earth wire of 575 km
Stringing of conductor of 575 km x 9 conductors
575 km OPGW and earth wire without fiber optic
Testing and Commissioning and handing over
MANAGEMENT ROLE OF NACO FOUNDER
General Manager of Contracting Company